{"id":2480,"date":"2017-07-25T14:54:50","date_gmt":"2017-07-25T13:54:50","guid":{"rendered":"https:\/\/www.sitec-is.co.uk\/?p=2480"},"modified":"2017-07-25T14:56:33","modified_gmt":"2017-07-25T13:56:33","slug":"ee-huawei-power-resilience-project","status":"publish","type":"post","link":"https:\/\/www.sitec-is.co.uk\/case-studies\/ee-huawei-power-resilience-project\/","title":{"rendered":"EE Huawei Power Resilience Project"},"content":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1500990977971{padding-top: 80px !important;padding-bottom: 80px !important;}&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]This project is for the upgrade of selected sites for:<\/p>\n<p>Conversion of power supply to the Huawei equipment from AC to -48V DC with a battery supply included.This includes the replacement of AC powered kit with -48V powered equipment.This is achieved by installing a new Emerson M35 from which to get the DC power supply.<\/p>\n<p>Generator specification options: Q35 model connected to an alarm system which is linked to EE\/MBNL.<\/p>\n<p>The triggering of alarms determines the status\/requirement\u00a0 of\/for\u00a0 the generator.<\/p>\n<p>Date installed:\u00a0 <strong>December 2016<\/strong><\/p>\n<p>The completion of this site has now enabled this site to be operating, even when the REC power supply is interrupted.<\/p>\n<h1><\/h1>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_willow_spacer size=&#8221;30px&#8221;][vc_single_image image=&#8221;2330&#8243; img_size=&#8221;medium&#8221; add_caption=&#8221;yes&#8221; css_animation=&#8221;animate_css animated fadeInUp&#8221;][vc_single_image image=&#8221;2331&#8243; add_caption=&#8221;yes&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1500990977971{padding-top: 80px !important;padding-bottom: 80px !important;}&#8221;][vc_column][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]This project is for the upgrade of selected sites for: Conversion of power supply to the Huawei equipment from AC to -48V DC with a battery supply included.This includes the replacement of AC powered kit with -48V powered equipment.This is achieved by installing a new Emerson M35 from which&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[54,56],"tags":[],"_links":{"self":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts\/2480"}],"collection":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/comments?post=2480"}],"version-history":[{"count":3,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts\/2480\/revisions"}],"predecessor-version":[{"id":2483,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts\/2480\/revisions\/2483"}],"wp:attachment":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/media?parent=2480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/categories?post=2480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/tags?post=2480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}