{"id":2198,"date":"2016-11-07T16:54:59","date_gmt":"2016-11-07T16:54:59","guid":{"rendered":"https:\/\/www.sitec-is.co.uk\/?p=2198"},"modified":"2017-07-25T14:34:52","modified_gmt":"2017-07-25T13:34:52","slug":"huawei-growth-supporting-ees-esn-deployment","status":"publish","type":"post","link":"https:\/\/www.sitec-is.co.uk\/news\/huawei-growth-supporting-ees-esn-deployment\/","title":{"rendered":"Huawei Growth Supporting EE\u2019s ESN Deployment"},"content":{"rendered":"<p>[vc_row][vc_column][vc_row_inner][vc_column_inner width=&#8221;2\/3&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: justify\">Last December, UK operator EE won a substantial contract from the government to provide 4G for the country\u2019s emergency services and Sitec are actively supporting this in both the upgrade of existing sites to support the 4G technology, alongside the building of power and transmission resilience in to these sites. Chris Jones, Construction Director says: \u201cThe first half of 2017 will be pivotal in securing the commitment to ensure sufficient network coverage is deployed by September 2017; we have built a strong team to support and deliver this project and will continue to invest heavily to ensure we meet our clients timescales.\u201d<\/p>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;][vc_single_image image=&#8221;2199&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css_animation=&#8221;animate_css animated fadeInUp&#8221;][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1441114698767{margin-top: 20px !important;}&#8221; full_width=&#8221;stretch_row&#8221;][vc_column][vc_row_inner][vc_column_inner][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_row_inner][vc_column_inner width=&#8221;2\/3&#8243;][vc_column_text] Last December, UK operator EE won a substantial contract from the government to provide 4G for the country\u2019s emergency services and Sitec are actively supporting this in both the upgrade of existing sites to support the 4G technology, alongside the building of power and transmission resilience in to these sites. Chris Jones, Construction&hellip;<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[52,2],"tags":[],"_links":{"self":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts\/2198"}],"collection":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/comments?post=2198"}],"version-history":[{"count":2,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts\/2198\/revisions"}],"predecessor-version":[{"id":2450,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/posts\/2198\/revisions\/2450"}],"wp:attachment":[{"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/media?parent=2198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/categories?post=2198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sitec-is.co.uk\/wp-json\/wp\/v2\/tags?post=2198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}